This project supplies outdoor oil-immersed power transformers for regional grid substations. The units feature a sealed oil tank, panel radiators, conservator tank, HV bushings and pressure/temperature monitoring instruments, designed for harsh outdoor conditions (extreme cold, sand, wide temperature range). Oil-immersed transformers deliver superior cooling and insulation, providing large-capacity, long-term reliable main-transformer duty for regional grids and industrial users.
Customers face the following needs and challenges in the construction of substations:
Large capacity stable power supply: As the main transformer of the substation, it needs to bear large capacity loads for a long time to ensure the continuous and stable operation of the power grid.
Outdoor environment adaptation: Located in areas with severe cold, sandstorms, and large temperature differences, the equipment needs to meet the requirements of all-weather outdoor operation and anti pollution.
Heat dissipation and insulation: Efficient heat sinks and high-quality insulation oil are required to ensure controlled temperature rise under full load and overload conditions.
Operational safety: Comprehensive pressure, oil level, and temperature monitoring and protection are required to ensure equipment safety and grid stability.
Zhejiang Shuntong Electric provides a complete set of outdoor oil immersed power transformer solutions:
Fully sealed fuel tank: adopting a fully sealed structure to isolate external moisture and delay the aging of insulation oil.
Plate type radiator: A large heat dissipation area plate type radiator group with efficient heat dissipation through natural oil circulation (ONAN), meeting the requirements of large capacity temperature rise.
Oil pillow (oil storage tank) and respiratory system: equipped with oil pillow and oil level/pressure monitoring to adapt to changes in oil temperature and outdoor operation.
High pressure casing and monitoring instruments: High pressure casing+pressure gauge/temperature gauge, real-time monitoring of operating status to ensure safety.
Design selection: Determine the transformer scheme based on the substation capacity, voltage level, and outdoor environment.
Production and testing: Complete coil winding, body assembly, oil injection, and routine/type testing.
On site installation: foundation positioning, body inspection, oil injection/treatment, conduit and cable connection, grounding construction.
Debugging and commissioning: Complete on-site tests and protection linkage for transformation ratio, insulation, temperature rise, etc., and deliver after confirming normal operation.
Improved power supply reliability: Large capacity main transformer+stable heat dissipation, ensuring continuous and reliable power supply to the substation.
Strong environmental adaptability: fully sealed and anti pollution design, suitable for outdoor environments such as severe cold, sandstorms, and large temperature differences.
Enhanced operational safety: Improved oil level/pressure/temperature monitoring to reduce the risk of malfunctions and shutdowns.
Optimization of operation and maintenance costs: mature and reliable, easy to maintain, reducing long-term operation and maintenance investment.
| |
| |
| |